Downs, J.
is an engineering fellow and manager of the Advanced Controls Technology group at Eastman Chemical Co. He has 33 years of experience in the design, startup and support of industrial processes. His research interests include plantwide control strategy design, plantwide process optimization and the process design/process control interface. Dr. Downs was recognized by the American Institute of Chemical Engineers, which honored him with a CAST Computing Practice Award in 1996 for his contribution to the profession.
Use model predictive control to achieve real-time management of a DWC
A dividing-wall column (DWC) can provide significant savings in energy and capital cost compared to a conventional distillation column design.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- U.S. EPA to remove proposed EV volumes from biofuel blending rule 6/6
- BASF increases alkoxylates production capacity in Europe 6/6
- Russia's Sakhalin invites India and China to tap energy resources 6/6
- Airlines urge co-operation to help curb emissions 6/6
- Oil prices steady as economic fears offset Saudi output cut 6/6
- U.S. diesel demand is falling despite economic growth 6/6
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction