Shukla, A.
Ashutosh Shukla is a Nitrogen Engineer with Dyno Nobel. He has worked in the ammonia industry for more than 25 yr in projects and operations management. He is a chemical engineer by profession, and a member of AICHE and the Institute of Engineers Australia. Mr. Shukla has been involved with EPC phases of large-scale ammonia plants in Australia and the U.S. from the client side during his career in the ammonia industry and has authored papers in the Ammonia Safety Symposium. He earned a BE in chemical engineering from Mangalore University, India.
Improve stability of ammonia plant steam systems to reduce unscheduled plant shutdowns
Dyno Nobel runs a 2,300-metric tpd purifier plant in Waggaman, Louisiana.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- EPA's proposed eRIN program raises concerns and sparks legislative action 6/8
- Neste enables Swedish airport and Västflyg airline to become the world's firsts to use SAF on all flights 6/8
- Valtek Valdisk High Performance Butterfly Valve, completes million-cycle test 6/8
- The sustainable aviation fuel entrepreneurs poised for takeoff 6/8
- India's May fuel consumption soars on robust manufacturing 6/8
- Kent awarded three-year multi-site Master Services Agreement with TotalEnergies 6/8
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction