Schult, C.
Noncapital intensive technologies reduce FCC sulfur content – Part 2
Using novel membrane technology, refiners have new solutions to treat gasoline for sulfur and olefins content
Noncapital intensive technologies reduce FCC sulfur content – Part 1
Innovative solutions such as catalysts and membranes can be used to navigate the 'roadmap' for clean fuels agenda
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Methanol Reformer to supply Mitsubishi Gas Chemical with L18 methanol reformer technology 12/10
- Clariant’s CATOFIN™ catalyst innovation boosts performance in Ningxia Runfeng’s PDH operations 12/10
- Hydrogen in aviation offers potential for growth and deeper emissions reductions, new study shows 12/9
- EnerMech awarded pre-commissioning scope from Bechtel for Woodside’s Pluto LNG 2 facility 12/9
- Borouge and Borealis launch Recleo™, a global brand for cost-effective mechanically recycled solutions 12/9
- Topsoe and Carbon Neutral Fuels partner to advance e-SAF with SOEC electrolyzer technology 12/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

