Zengjun, Y.
Yang Zengjun is a Senior Engineer at CTCI Beijing, a CTCI company. He is also a member of the CPCEA HVAC Professional Committee, a registered utility engineer (HVAC, power), a registered constructor and a registered consulting engineer. He is primarily engaged in HVAC design for petrochemical plants.
Design optimization of an HVAC system in a petrochemical plant’s controls building
Distributed Control System
/ Environment
/ Environment & Safety
/ Petrochemicals
/ Process Optimization
/ Process Control
/ Engineering & Design
/ Safety
Since petrochemical plant control buildings are usually designed to be blast-resistant without external windows, convection ventilation cannot be carried out, leading to poor air circulation. As a result, there are higher requirements for indoor air quality, and it is necessary to optimize the heating, ventilation and air conditioning (HVAC) system design scheme to improve air quality.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Lummus Technology completes acquisition of NAPCON from Neste, expanding digital and AI capabilities 6/2
- IATA expects sustainable aviation fuel production to double in 2025 6/2
- RIC Energy and Siemens to jointly develop renewable H2, green ammonia and eFuels 6/2
- Trump administration (U.S.) axes $3.7-B in green energy projects 6/2
- European chemical industry pessimistic for 2025, recovery not until 2026 says new report 6/2
- U.S. ethanol output eases off record pace as summer travels heat up 6/2
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction