Pendergrass, J.
John Pendergrass is a Senior Engineer at CPFD LLC with 26 yr of experience applying simulations to multiphase processes. He has worked in the petrochemical industry with both engineering/design and simulation services companies. Over the past 6 yr, he has executed multiple full-scale simulation projects for FCCUs.
Viva Energy’s Geelong refinery reduces FCCU turnaround risk
Maintenance & Reliability
/ Process Optimization
/ Project Management
/ Refining
/ Catalysts
/ Loss Prevention
/ Management
/ Safety
Change involves risk. Many fluidized catalytic cracking units (FCCUs) can be operated more profitably, but changes to achieve more efficient operations can be risky.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- KT-Kinetics Technology, NEXTCHEM awarded contracts for Petronas hydrogen unit 1/14
- Chinese, Indian refiners seek new supplies as US sanctions tighten grip on Russian oil 1/14
- Clariant to fight 1.4-B euro ethylene lawsuit from BASF 1/14
- Poland's Orlen plans to invest up to nearly $92 B by 2035 1/14
- Genesis Fertilizers, Stamicarbon partner to advance sustainable urea production 1/14
- Sinopec Shanghai Petrochemical to invest $2.9 B to upgrade Chinese operations 1/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction