Blaser, P.
Peter Blaser is Vice President of Engineering Services at CPFD LLC, with 20 yr of experience in developing and applying specialized computational fluid dynamics (CFD) technologies. Since 2010, Mr. Blaser has applied his expertise in fluidization and fluid-particle computational modeling toward refinery troubleshooting and improvements via simulation, with emphasis on the FCCU and related components.
Viva Energy’s Geelong refinery reduces FCCU turnaround risk
Maintenance & Reliability
/ Process Optimization
/ Project Management
/ Refining
/ Catalysts
/ Loss Prevention
/ Management
/ Safety
Change involves risk. Many fluidized catalytic cracking units (FCCUs) can be operated more profitably, but changes to achieve more efficient operations can be risky.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- BASF introduces BDO, THF, PolyTHF and NMP product variants with reduced product carbon footprint 3/9
- Equilibrion and Rolls-Royce sign MoU to advance SAF using nuclear energy 3/9
- Iverson eFuels to discontinue green ammonia project in Norway due to grid capacity 3/9
- Hypersonix’s DART AE completes its first flight, reaching hypersonic speeds 3/9
- U.S. fuel exports see slight uptick in 2025 3/9
- South Australia to host HAMR Energy’s first-of-its kind methanol-to-jet fuel facility 3/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

