Pramanik, R.
has more than 35 yr of experience in working with Engineers India Ltd., Bechtel, Foster Wheeler and Fluor Daniel in the design and engineering of heat transfer equipment in the oil and gas, petrochemical, LNG, fertilizer, chemical and power sectors. Presently, he is working as an independent consultant.
Mechanical design challenges in high-temperature electric heaters
Electric heaters are used in the process industries as an alternative to fired heaters or process heaters—where the heating medium is either steam or any heating fluid—for some specific applications where the process duties are low but fluids are heated to high temperature.
Air-cooled heat exchanger operation under emergency cooling service
Gas Processing/LNG
/ Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Carbon Management
/ Engineering & Design
/ Environment
/ Equipment
One of the challenges in the operation of air cooled heat exchangers (ACHEs) is to decide whether or not to operate under natural convection.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Petrobras wrapping up due diligence to buy back refinery from Mubadala 7/26
- US court rejects EPA denials of 2022 small refinery biofuel waivers 7/26
- Mexico seeks more 2025 fuel import deals after refinery delays 7/26
- PETRONAS, Eni and Euglena reach FID to construct a biorefinery in Malaysia 7/26
- ExxonMobil signs carbon capture agreement with CF Industries in Mississippi (U.S,) 7/26
- WoodMac: LNG truck sales impacting Chinese road diesel demand 7/26
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction