Ganapathy, V.
Rethink planning for heat-recovery systems
Better early design of steam generators can save lots of money in operating cogeneration plants
How emissions affect HRSGs
Here’s how NOx and CO control methods influence designs
Optimize energy efficiency of HRSG
With a better understanding of temperature profiles, plant engineers can increase steam production and minimize losses
Superheaters: design and performance
Understand these factors to improve operation
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- U.S. says there are significant undiscovered oil and gas resources in Wyoming 5/21
- Bureau Veritas grants AiPs for IMODCO’s portfolio of jetty-less solutions for new energies transfers 5/21
- Saudi Arabia crude exports fall to 5.754 MMbpd in March 5/21
- Low diversity in critical mineral markets could hurt industry, IEA says 5/21
- India's Russian oil imports hit 10-month high on strong demand for ESPO crude 5/21
- Akselos tackles flange failures with breakthrough SPM module 5/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction