Dyment, J.
Jennifer Dyment is a member of AspenTech’s product team. She advises oil, gas and petrochemical customers on how to meet operational challenges with AspenTech’s aspenONE Engineering solutions. Ms. Dyment’s background is in chemical engineering. She is a graduate of the Thayer School of Engineering at Dartmouth College.
Optimizing the dehydration process with advanced process simulation
Gas Processing/LNG
/ Acid Gas Removal
/ Aromatics
/ Boilers
/ Process Optimization
/ Engineering & Design
/ Environment
/ Loss Prevention
/ Natural Gas
/ Safety
/ Treating
In the operation of natural gas pipelines, a blockage or leak can cause expensive production losses, damage equipment and pose safety hazards.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Transition Industries signs agreements for the Pacifico Mexinol Project, an ultra-low carbon chemical production facility 7/3
- Bangkok Airways introduces SAF on commercial flights 7/3
- EcoCeres secures SAF contract with British Airways to help reduce carbon emissions 7/3
- Air Liquide to invest up to $200 MM in Louisiana, U.S. to support industrial growth 7/3
- MOL completes the acquisition of LBC Tank Terminals 7/3
- BHP awards charter contracts for two ammonia dual-fueled vessels 7/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction