Dyment, J.
Jennifer Dyment is a member of AspenTech’s product team. She advises oil, gas and petrochemical customers on how to meet operational challenges with AspenTech’s aspenONE Engineering solutions. Ms. Dyment’s background is in chemical engineering. She is a graduate of the Thayer School of Engineering at Dartmouth College.
Optimizing the dehydration process with advanced process simulation
Gas Processing/LNG
/ Acid Gas Removal
/ Aromatics
/ Boilers
/ Process Optimization
/ Engineering & Design
/ Environment
/ Loss Prevention
/ Natural Gas
/ Safety
/ Treating
In the operation of natural gas pipelines, a blockage or leak can cause expensive production losses, damage equipment and pose safety hazards.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- INEOS CEO Sir Jim Ratcliffe: Carbon tax and high energy costs are killing off manufacturing in Britain 4/29
- Topsoe chosen as technology provider by Zhejiang Jianglan for SAF project 4/29
- thyssenkrupp Uhde, Praj Industries Ltd partner to revolutionize polylactic acid production and circular economy 4/29
- WastAway receives U.S. patent for its entire waste-to-fuel process 4/29
- Spanish oil refineries shut down after power blackout 4/29
- Grangemouth refinery (Scotland) ceases crude oil processing, transitions into import terminal 4/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction