Sivasubramanian, G.
Gopi Sivasubramanian is a Principal Consultant with Arivergy LLC. He has 24 yr of industry experience, most of it with Foster Wheeler and Engineers India Ltd. Mr. Sivasubramanian’s extensive career has included process design, technology and engineering expertise in areas of crude and vacuum distillation, hydroprocessing, hydrogen and sour water stripping/amine treating. His specialties include process design packages, revamp design and engineering, optimization, consulting, studies and PMC team roles.
Project Management: Bridging the gap in revamp projects—From business need to design basis
Revamp projects are notorious for scope creep, cost and schedule overruns.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ITT to acquire SPX Flow for > $4.77 B, expanding leadership in highly engineered components and adjacent flow technologies 12/5
- MOL Group introduces eco-friendly Bag-in-Box packaging for lubricants 12/5
- Addis Energy secures $8.3 MM to scale its transformative approach to low-cost ammonia production 12/5
- World Fuel Services supplies cruise line with waste-based biofuels 12/5
- Chevron announced $18 B-$19-B CAPEX budget for 2026 12/5
- Russia and India sign deal to build urea plant in Russia 12/5
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

