Sivasubramanian, G.
Gopi Sivasubramanian is a Principal Consultant with Arivergy LLC. He has 24 yr of industry experience, most of it with Foster Wheeler and Engineers India Ltd. Mr. Sivasubramanian’s extensive career has included process design, technology and engineering expertise in areas of crude and vacuum distillation, hydroprocessing, hydrogen and sour water stripping/amine treating. His specialties include process design packages, revamp design and engineering, optimization, consulting, studies and PMC team roles.
Project Management: Bridging the gap in revamp projects—From business need to design basis
Revamp projects are notorious for scope creep, cost and schedule overruns.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- LanzaJet expands partnership with Microsoft to strengthen the company’s global growth 6/13
- Phelan Green Group's $2.6-B eMethanol project remains on schedule 6/13
- Algeria launches $7-B investment plan to expand hydrocarbon processing 6/13
- AFPM/API: President Trump officially overturns California (U.S.) gas car ban 6/12
- Decision on oil refiner Italiana Petroli's sale expected around end-June 6/12
- EIA: U.S. crude stocks fall, gasoline and distillate inventories rise as refining activity increases 6/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction