Sivasubramanian, G.
Gopi Sivasubramanian is a Principal Consultant with Arivergy LLC. He has 24 yr of industry experience, most of it with Foster Wheeler and Engineers India Ltd. Mr. Sivasubramanian’s extensive career has included process design, technology and engineering expertise in areas of crude and vacuum distillation, hydroprocessing, hydrogen and sour water stripping/amine treating. His specialties include process design packages, revamp design and engineering, optimization, consulting, studies and PMC team roles.
Project Management: Bridging the gap in revamp projects—From business need to design basis
Revamp projects are notorious for scope creep, cost and schedule overruns.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Syensqo and Axens launch Argylium to accelerate Europe's solid-state battery breakthrough 1/6
- Samsung E&A breaks ground on 500,000-tpy ammonia facility in the U.S. 1/6
- Nova Sustainable Fuels project reaches key milestone with environmental assessment approval 1/6
- VLS Environmental Solutions acquires Merichem's caustic services business 1/6
- Phillips 66 says two U.S. Gulf Coast refineries can process Venezuelan crude 1/6
- Nigeria's Dangote oil refinery says fuel supply intact amid maintenance 1/6
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

