Forbes, B.
Brandon Forbes has 14 yr of experience designing steam and liquid heating systems for refinery and chemical applications. He now oversees product development for Controls Southeast Inc., an AMETEK company. He received his Bch degree in mechanical engineering from the University of North Carolina Charlotte, and obtained his PE while working at CSI.
Strategies to minimize piping thermal maintenance system cost without compromising performance
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Economics
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Piping
/ Americas
/ Middle East
Where process fluid must be maintained within a certain operating temperature window, the piping will likely require the application of a thermal maintenance system.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- China’s Sinopec begins Xinjiang refining and chemical upgrading project 9/22
- bp abandons plans to build Rotterdam biofuels plant 9/22
- Kisuma Chemical boosts plastics recycling with suite of additive solutions 9/22
- VDMA: Industrial valves market grows by 8% in 1H of 2025 9/22
- Methanol Reformer, McAlpha and Ekora sign MoU to advance methanol-based hydrogen and power solutions in Turkey 9/22
- Lummus and Synthomer announce partnership to license acrylic acid esters technology 9/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction