A. M. Al-Suwaidi
Abdulla Mohammed Al-Suwaidi is a Process Engineering Manager at ADNOC Refining. He has more than 20 yr of expertise, with a wide range of experience in plant operations, process engineering, troubleshooting and project management of refinery process plants, covering crude distillation to utilities. He earned a BS degree in chemical engineering from Washington State University.
RFCCU revamp to improve main fractionator gascon column performance and minimize propylene losses to refinery offgas
This article will discuss the critical parameters that could potentially affect the performance of a residue fluid catalytic cracking plant’s main fractionator and gas concentration (gascon) section columns. It will also elaborate on how the systematic troubleshooting methodology helped to solve the problems and improve column performance.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

