Fisher, P.
Monitor safety with improved risk performance indicators
Environment & Safety
/ Process Control
/ Information Systems
/ Loss Prevention
/ Management
/ Safety
Using Layer of Protection Analysis (LOPA) and real-time operational data, statistical estimates of the frequencies of future hazardous events can be generated. Combined with a qualitative estimate of the severity of hazardous events and the tolerable frequency determined in the LOPA, an objective leading metric of hazardous events can be created.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Ergon to invest $400 MM to expand gasoline production at Vicksburg refinery (U.S.) 4/2
- DB Schenker to use Neste's renewable diesel to decarbonize logistics in Asia 4/2
- U.S. EPA's upcoming proposal on biofuel blending mandates to cover two years 4/2
- ExxonMobil to invest more than $100 MM in Baton Rouge upgrade to produce high-purity isopropyl alcohol 4/2
- Stockholm Exergi to begin building one of the world's largest carbon capture projects using CATACARB Enhanced HPC 4/2
- KazMunayGas starts building polyethylene plant with Sinopec, SIBUR 4/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction