Mokhtar, I. S. A. M.
Ir. Saiful Anuar Mohd Mokhtar has more than 18 yr of work experience in the refining, natural gas/LNG and petrochemical sectors as an Engineering Manager and Head Process Engineer for various Petronas capital projects. At present, he is the Head Process Engineer for Petronas Chemical Group’s titanium program. Mr. Mokhtar is a Chartered Chemical Engineer (CEng) with IChemE and a Professional Engineer (PEng) with the Board of Engineers Malaysia.
Optimizing for viability—VDU revamp in a brownfield project
Process Optimization
/ Refining
/ Distillation
/ Economics
/ Engineering & Design
/ Heat Transfer
/ Loss Prevention
/ Asia/Pacific
Revamping an existing column in an operating plant for higher throughput is a challenge, especially when the column is already operating at its rated capacity.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Russia's Ryazan oil refinery restores crude processing to 60% of pre-attack level 3/28
- Global refinery capacity totaling 3.6 MM bpd at high-risk of closure 3/28
- More than 20% of global oil refining capacity at risk, analysis finds 3/28
- SABIC Fujian Petrochemicals advances major ethylene project with Lummus technologies and services 3/28
- Singapore fuel oil stockpiles slip to two-week low 3/28
- Sri Lanka minister says Sinopec to start work on refinery by June 3/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction