Jordan, S.
Stephen Jordan has more than 50 yr of experience for several large international companies as a senior-level engineering, design, projects, commissioning, plant startup and data analysis for 13 processes, including coal gasification, fluid bed and solid processes, and chemical production. He has managed or supported grassroot startups for several domestic and international projects. He has extensive experience with the operation of small- to large-scale pilot plants, first commercial plants, as well as laboratories, manufacturing, engineering, R&D, and acting as an expert witness.
Diagnostics tools and techniques for large-scale operating fluidized beds
Intrusive and non-intrusive diagnostic tools and techniques for fluidized bed reactors are discussed here, with a focus on chemical synthesis catalytic reactions.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Russia's Ryazan oil refinery restores crude processing to 60% of pre-attack level 3/28
- Global refinery capacity totaling 3.6 MM bpd at high-risk of closure 3/28
- More than 20% of global oil refining capacity at risk, analysis finds 3/28
- SABIC Fujian Petrochemicals advances major ethylene project with Lummus technologies and services 3/28
- Singapore fuel oil stockpiles slip to two-week low 3/28
- Sri Lanka minister says Sinopec to start work on refinery by June 3/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction