Abid, J.
Jamshaid Abid is a Piping/Project Engineer with more than 16 yr of experience in project design, engineering, installation and commissioning for onshore oil and gas (greenfield and brownfield developments) and ammonia-urea plants in Iraq, Pakistan, the UAE and Yemen. He holds a BE degree in mechanical engineering from the University of Engineering and Technology in Taxila, Pakistan.
Supply Chain: How to reduce piping inventory
Piping represents a significant part of the plant cost, ranging from 15%–25%.1 Materials stored in warehouses or storage facilities cost companies in terms of personnel, materials, time, space, insurance, risk, etc. This article proposes cost-saving strategies for inventory reduction. Further, it emphasizes consistent naming conventions to avoid creating duplicate/redundant items.
Project Management: Estimate skid and package dimensions
In the absence of vendor quotations or detailed engineering, preliminary dimensions of skids or packages can be estimated quickly using the ratio method.
- 1
- ... 1 pages
- Emirates adds SAF on flights from Amsterdam Schiphol Airport 3/27
- Shipping industry faces fuel dilemma in bid to cut emissions 3/27
- Japan's Idemitsu, Mitsui Chemicals may consolidate ethylene plants in Chiba 3/27
- Nozomi Networks extends partnership with Yokogawa to deliver OT and IoT security services worldwide 3/27
- Nigeria's Dangote oil refinery could accelerate European sector's decline 3/27
- Global energy giants commit to accelerated transition to low-carbon future 3/27