Aronen, R.
Amine pumps upgraded for improved operations and reliability
Asia/Pacific
/ Gas Processing/LNG
/ Maintenance & Reliability
/ Carbon Management
/ Economics
/ Engineering & Design
/ Loss Prevention
/ Pumps
/ Rotating Equipment
/ Safety
A gas processing plant in Malaysia eliminated a source of expensive failures in its acid gas removal unit (AGRU).
Improve pump reliability with advanced composite wear rings
The results were reduced vibration and seal leaks at this plant
Improving equipment reliability through e-learning
It will change the way people work, learn, communicate and solve problems
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Technip Energies and Anellotech to jointly develop sustainable plastics recycling 4/22
- BHP says it aims to receive first ammonia-fueled bulk carrier in 2026 4/22
- Biofuels refiner Ecoceres expects Malaysia unit to start up in second half 2025 4/22
- Neste successfully concludes its first processing run with pyrolysis oil from discarded tires 4/22
- NextChem advances plastic upcycling with NX Replast technology, boosting the circular economy 4/22
- BASF now offering polyamides for the textile industry according to Recycled Claim Standard 4/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction